Table 10

Summary of intervention programmes

ParameterIntervention programme
IP1IP2IP3
Annual budget limit: kmuNo limitNo limitNo limit
Planning period: years555
All candidate interventions executed (yes/no)YesYesYes
Number of projects16971431800
Costs (intervention execution): kmu152.852.1196.0
Costs (traffic disruption): kmu240.5379.2523.6
Costs (service interruption): kmu21.57.827.5
Risk reduction: kmu591.8596.1917.6
Net benefit: kmu177.1157.0170.5
Number of objects – facility (building)13812144
Number of objects – facility (electrical supply)39735403
Number of objects – facility (hydraulics)57028585
Number of objects – facility (IT/surveillance)4375441
Number of objects – facility (measurements)5613561
Number of objects – facility (treatment)1300130
Number of objects – distribution pipes983361006
Number of objects – transmission pipes166474
Length – distribution pipes: km148.613.5159.1
Length – transmission pipes: km8.239.443.3