Table 2

Summary of pile performance acceptance

ProjectNumber of pilesaWeapCapwap
EODBOREODBOR
Owl Creek (B2P5)5No (−30%)No (−27%)No (−12%)No (−5%)
Woods Wardell (PI2P1)14No (−65%)No (−63%)No (−3%)Yes (10%)
Burns South (PI3P1)21No (−41%)No (−40%)No (−7%)Yes (0·4%)
Burns south (A1P1)5No (−36%)No (−34%)Yes (2%)Yes (11%)
Casper (A2P1)14Yes (33%)Yes (33%)Yes (30%)Yes (46%)
Torrington (A2P1)9No (−15%)Yes (6%)No (−28%)No (−19%)
a

Number of production piles at the respective bent, pier or abutment location

B, bent number; PI, pier number; A, abutment number; P, pile number; Yes, satisfied the LRFD strength limit state; No, did not satisfy the LRFD strength limit state; %, percentage higher (positive) or lower (negative) than the factored load