Expected results based on an annual 2% improvement in energy efficiency
| Item | Actions to reduce CO2 emissions by various agencies | |||
|---|---|---|---|---|
| Agency | Projects | Quantity (million tons) | Reduction contribution ratio (%) | |
| Conservation | ||||
| (1) Energy intensity to be reduced by 2%/year | 76.180 | 36.3 | ||
| Clean energy | ||||
| (2) Natural gas | BOE | Expand use of low-carbon natural gas, with 14 million tons of natural gas supply forecasted in 2020 | 15.997 | 7.6 |
| (3) Renewable energy | BOE | Development target for renewable energy: cumulative installation capacity of 5.78 million KW by 2020 | 4.961 | 2.5 |
| Use of solar water heaters: cumulative installation area of approximately three million square meters by 2020 | 0.246 | |||
| (4) Nuclear power generation | BOE | Chin Shan Nuclear Power Plant’s commission to be extended; Lungmen Nuclear Power Plant in operation | 28.700 | 13.7 |
| (5) Power generation efficiency | BOE | Improve nuclear power generation efficiency | 0.705 | 1.2 |
| Promote cogeneration system settings | 1.904 | |||
| Carbon sink | ||||
| (6) Carbon sink | Council of Agriculture | Afforestation | 1.080 | 0.5 |
| Carbon credit trading | ||||
| (7) Carbon credit trading | BOE | Planting of Indonesian biodiesel source material | 2.000 | 15.5 |
| Carbon credit trading by the TPC | 30.510 | |||
| Others | ||||
| (8) Gap | 47.717 | 22.7 | ||
| Item | Actions to reduce CO2 emissions by various agencies | |||
|---|---|---|---|---|
| Agency | Projects | Quantity (million tons) | Reduction contribution ratio (%) | |
| (1) Energy intensity to be reduced by 2%/year | 76.180 | 36.3 | ||
| (2) Natural gas | BOE | Expand use of low-carbon natural gas, with 14 million tons of natural gas supply forecasted in 2020 | 15.997 | 7.6 |
| (3) Renewable energy | BOE | Development target for renewable energy: cumulative installation capacity of 5.78 million KW by 2020 | 4.961 | 2.5 |
| Use of solar water heaters: cumulative installation area of approximately three million square meters by 2020 | 0.246 | |||
| (4) Nuclear power generation | BOE | Chin Shan Nuclear Power Plant’s commission to be extended; Lungmen Nuclear Power Plant in operation | 28.700 | 13.7 |
| (5) Power generation efficiency | BOE | Improve nuclear power generation efficiency | 0.705 | 1.2 |
| Promote cogeneration system settings | 1.904 | |||
| (6) Carbon sink | Council of Agriculture | Afforestation | 1.080 | 0.5 |
| (7) Carbon credit trading | BOE | Planting of Indonesian biodiesel source material | 2.000 | 15.5 |
| Carbon credit trading by the TPC | 30.510 | |||