Examples of project results
| Increase in the percentage of elderly patients getting surgery for hip fracture within 48 h from 59 to 75% (follow-up measured performance: 82%) |
| Reduction in average yellow code waiting times in first-aid units from 41 to 32 min (follow-up measured performance: 28 min) |
| Lead time reduction of the oncology patient pathways undergoing mid and long-term chemotherapy from 152 and 241 min to 130 and 200 min, respectively (follow-up measured performance: 127 and 194 min) |
| Increase in the percentage of elderly patients getting surgery for hip fracture within 48 h from 59 to 75% (follow-up measured performance: 82%) |
| Reduction in average yellow code waiting times in first-aid units from 41 to 32 min (follow-up measured performance: 28 min) |
| Lead time reduction of the oncology patient pathways undergoing mid and long-term chemotherapy from 152 and 241 min to 130 and 200 min, respectively (follow-up measured performance: 127 and 194 min) |
Source(s): Authors' own
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.