Table 5

Costs and times of disruptive events

StructureCostTime
MeanP90thP90th: increased %MeanP90thP90th: increased %
Earthwork354 312 747.94407 968 130.1167.00354.12425.7098.00
Bridge89 142 843.7097 914 726.0038.00474.56544.0060.00
Pavement630 565 944.98667 250 905.5035.00287.74323.3349.00
Overall project1 038 796 512.201 154 839 722.8742.66473.85544.0060.00