Indices, parameters, decision variables and constrains for CSPTS
| Symbol | Description |
|---|---|
| Decision variables | |
| Xk,p,c,o,s | The same meaning as for the CSP1 |
| XOk,c,p,o,s | If product p is delivered from the manufacturer (factory) k to the distribution center c using means of transport s, then XOk,c,p,o,s=1, otherwise XOk,c,p,o,s=0 |
| XHf,i,j | The same meaning as for the CSP3 |
| THf,o | The total time of delivery to the customer o |
| Constrain | |
| It determines the time of delivery, i.e. how long it takes for the delivery from the manufacturer (factory) to the customer | |
| (C27) | |
| Symbol | Description |
|---|---|
| The same meaning as for the CSP1 | |
| If product | |
| The same meaning as for the CSP3 | |
| The total time of delivery to the customer | |
| It determines the time of delivery, i.e. how long it takes for the delivery from the manufacturer (factory) to the customer | |