Confusion matrix for leading analysis (logistic regression and support vector machine)
| Prediction | |||
|---|---|---|---|
| Expansion | Contraction | Total | |
| Panel A: Excluding the OnBid auction rate (Logistic regression) | |||
| Actual | |||
| Expansion | 72 | 28 | 100 |
| Contraction | 22 | 64 | 86 |
| Total | 94 | 92 | 186 |
| Panel B: Including the OnBid auction rate (Logistic regression) | |||
| Actual | |||
| Expansion | 73 | 27 | 100 |
| Contraction | 23 | 63 | 86 |
| Total | 96 | 90 | 186 |
| Panel C: Excluding the OnBid auction rate (Support vector machine) | |||
| Actual | |||
| Expansion | 82 | 18 | 100 |
| Contraction | 11 | 75 | 86 |
| Total | 93 | 93 | 186 |
| Panel D: Including the OnBid auction rate (Support vector machine) | |||
| Actual | |||
| Expansion | 83 | 17 | 100 |
| Contraction | 7 | 79 | 86 |
| Total | 90 | 96 | 186 |
| Prediction | |||
|---|---|---|---|
| Expansion | Contraction | Total | |
| Actual | |||
| Expansion | 72 | 28 | 100 |
| Contraction | 22 | 64 | 86 |
| Total | 94 | 92 | 186 |
| Actual | |||
| Expansion | 73 | 27 | 100 |
| Contraction | 23 | 63 | 86 |
| Total | 96 | 90 | 186 |
| Actual | |||
| Expansion | 82 | 18 | 100 |
| Contraction | 11 | 75 | 86 |
| Total | 93 | 93 | 186 |
| Actual | |||
| Expansion | 83 | 17 | 100 |
| Contraction | 7 | 79 | 86 |
| Total | 90 | 96 | 186 |
Notes:
This table reports three-month-ahead prediction results by using logistic regression (Panels A and B) and support vector machine (Panels C and D). Note that the total number of three-month-ahead building blocks used in multiperiod binary classification is 186 months that consist of 86 months in contraction and 100 months in expansion
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.