Table 2

Effective design rules to reduce set-up times

Technical improvementDesign guidelines
1. Simplification
  • Lighten those parts that will be moved during set-up

  • Eliminate the need to disassemble elements that will not be replaced

  • Eliminate the need to replace elements by making them modifiable

  • Design modular assemblies/parts

  • Delete pipe connections, or use quick plug connections

  • Facilitate easy access to the machinery or to the parts subject to set-up operations

  • Simplify the actions of the employees by focusing on ergonomics

  • Design parts following the principles of Poka-Yoke

2. Standardization
  • Standardize bolts

  • Standardize functional dimensions of parts of machinery and equipment

  • Design standard machine parts

3. Quick fixing
  • Use few bolt types

  • Use quick locking devices (one-turn, one-motion, interlocking)

  • Use hydraulic, pneumatic or electromagnetic locking devices

4. Optimization of adjustments
  • Avoid internal placements and adjustments

  • Avoid manual adjustments by using simple and quick adjustment systems

  • Equip the machinery with appropriate centering and positioning systems

  • Introduce integrated measuring and control devices

  • Equip the machinery with discreet positioning systems

  • Use centering templates

  • Use the Least Common Multiple principle

5. Externalization
  • Grant safe access to the machinery while it is operating

  • Introduce external buffers or duplicate parts

  • Use masks or intermediate bases

  • Integrate equipment or workbenches for early preparation

6. Mechanization
  • Integrate tools for moving heavy or bulky parts

  • Use special tools to speed up the internal tooling phases

  • Mechanize machine parts for quick, non-manual set-ups

Source(s): Authors' work

or Create an Account

Close Modal
Close Modal