Table 4

Round two Delphi study results – elements of OMP for maintenance management of public buildings in Nigeria

Sub-attributesMedian (M)Mean (x¯)Standard deviation (σx)Interquartile deviation (IQD)Mean scores ranking (R)
Organisation operational efficiency88.111.551.0012
Suitable maintenance procedures and process98.311.541.006
Assembling of maintenance organisation structure88.250.771.008
Analysis of maintenance procedures55.501.411.2523
Preparation of maintenance operation88.130.721.0010
Preparation of safety procedure98.591.080.631
Risk factor establishment98.380.721.005
Target performance measurement66.651.272.0017
Routinisation of optimisation techniques65.701.361.6520
Maintenance strategies development88.051.481.0014
Spare-part management66.251.442.0018
Meeting maintenance objectives88.001.731.0015
Optimisation of the maintenance policy98.531.730.502
Optimisation of the maintenance action plan98.472.100.503
Well-defined priority system98.401.241.004
Appropriate procurement strategy88.071.491.0012
Change in policy and its associated results88.201.521.009
Working in-line with regulatory agencies*65.601.922.0021
Maintenance contracts suitability66.731.582.0016
Timely identification of maintenance work66.001.201.5019
Reduction in mean time to repair55.601.352.0021
Design of a preventive plan*88.270.701.007
Optimisation of preventive maintenance design*88.130.740.5010

Note(s): The three marked *italic elements in Table 4 were the new elements of OMP that the panelist suggested and was included for rating by all the experts in the second round of the questionnaire because they were considered important by the research team