Table A3

ICC results according to RStudio

Construct: Digital capability
95% Confidence interval3
Type1ICC2F-testdf1df2p-valueLower boundUpper bound
Average_random_ratersICC2k0.826.53343,3406.8e−1910.810.83
Construct: Digital cloud technology
95% Confidence interval3
Type1ICC2F-testdf1df2p-valueLower boundUpper bound
Average_random_ratersICC2K0.856.93346681.1e−980.830.86
Construct: Digital strategy
95% Confidence interval3
Type1ICC2F-testdf1df2p-valueLower boundUpper bound
Average_random_ratersICC2K0.92163343,00600.920.93
Construct: Management support
95% Confidence interval3
Type1ICC2F-testdf1df2p-valueLower boundUpper bound
Average_random_ratersICC2K0.795.53346681.7e−780.760.81
Construct: Organizational performance
95% Confidence interval3
Type1ICC2F-testdf1df2p-valueLower boundUpper bound
 ICC2K0.94183343,67400.940.94

Note(s):1 Type = CC2K is the two-way Mixed Effect Model convention using the mean value of K raters. Its calculation in RStudio is carried out by means of the following function: ICC (dataframe, missing = TRUE, alpha = 0.5, lmer = TRUE, check.keys = FALSE)

2 CCI: Values between 0.75 and 0.9 indicate good reliability and values greater than 0.9 indicate excellent reliability (Koo and Li, 2016)

3 At 95% confidence all CCI values are between the lower and upper limits

Source(s): Authors own

or Create an Account

Close Modal
Close Modal