Table 5.

AEC and SDEC of the Shewhart control chart when different Phase I samples are used to estimate the process parameters

mδ´
0.512345
2047.305 (9.806) 32.198 (5.944)19.740 (1.6230)16.150 (0.5131)14.9512 (0.1659)14.6068 (0.0436)
10046.506 (4.618)31.352 (2.504)19.498 (0.6571)16.071 (0.2150)14.9141 (0.0677)14.5871 (0.0139)
30046.363 (2.687)31.220 (1.418)19.473 (0.3753)16.057 (0.1220)14.9077 (0.0387)14.5840 (0.0075)
50046.328 (2.073)31.185 (1.095)19.460 (0.2919)16.055 (0.0940)14.9068 (0.0295)14.5833 (0.0057)
70046.311 (1.756)31.178 (0.9314)19.457 (0.2449)16.054 (0.0798)14.9060 (0.0250)14.5830 (0.0047)
90046.301 (1.537)31.172 (0.8167)19.456 (0.2158)16.053 (0.0704)14.9057 (0.0221)14.5829 (0.0041)
110046.284 (1.404)31.162 (0.7420)19.453 (0.1948)16.053 (0.0632)14.9056 (0.0201)14.5828 (0.0038)
46.26731.14219.44916.05114.90414.582

Note:

For every value of shift size, the first value is the AEC, and the value between brackets is the SDEC

or Create an Account

Close subscription notice
Close access options