Case study details
| Item | Description |
|---|---|
| Typology | Concrete structure with masonry partitioning |
| Number of floors | 3 |
| Capacity | 386 students |
| Floor area (m2) | 10,500 |
| Open area (m2) | 12,000 |
| Number of rooms | 245 (194 single rooms, 94 double rooms and 4 disable rooms) |
| Number of toilets | 155 |
| Number of bathrooms | 102 |
| Air-conditioning systems | 21 Central condenserless units |
| Item | Description |
|---|---|
| Typology | Concrete structure with masonry partitioning |
| Number of floors | 3 |
| Capacity | 386 students |
| Floor area (m2) | 10,500 |
| Open area (m2) | 12,000 |
| Number of rooms | 245 (194 single rooms, 94 double rooms and 4 disable rooms) |
| Number of toilets | 155 |
| Number of bathrooms | 102 |
| Air-conditioning systems | 21 Central condenserless units |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.