Table 2

Project management impact, challenges and preparedness during COVID-19

FactorValue
COVID-19 impact level n (%)
Mild93 (32.6%)
Moderate106 (37.2%)
Severe86 (30.2%)
PM activity impacted n (%)
Planning83 (29.1%)
Scheduling92 (32.3%)
Controlling74 (26.0%)
Other36 (12.6%)
PM preparedness n (%)
No planning77 (27.1%)
Limited planning107 (37.5%)
Prepared101 (35.4%)
Challenges n (%)
Delayed projects152 (53.3%)
Losing projects46 (16.1%)
Lack of flexibility37 (13.0%)
Other50 (17.5%)
Current projects situation n (%)
Not recovered191 (67.0%)
Recovered94 (33.0%)

Note(s): Number of respondents = 285

Source(s): Table by authors