Table 4

Empirical findings controlling for the public credit provided by BNDES

Variable/ModelParameter(3)(3b)(3c)(3d)
Infrastructure investmentLong-run0.58*** [0.08]0.58*** [0.09]  
Short-run0.57*** [0.08]0.47*** [0.09]  
Public investmentLong-run  0.52*** [0.16]0.45** [0.19]
Short-run  0.52*** [0.16]0.04 [0.19]
Demand growthLong-run0.31** [0.12]0.33** [0.15]0.34 [0.22]0.46* [0.23]
Short-run−0.23* [0.12]0.53*** [0.09]2.36*** [0.22]2.42*** [0.23]
Inflation rateLong-run−0.01 [0.01]−0.02* [0.01]−0.02 [0.02]−0.03 [0.02]
Short-run0.004 [0.01]0.001 [0.01]−0.02 [0.02]0.004 [0.02]
Terms of tradeLong-run0.54*** [0.20]0.54** [0.22]0.60* [0.32]0.67* [0.39]
Short-run0.27 [0.20]0.54** [0.22]0.60* [0.32]1.14*** [0.39]
Labor costLong-run−0.07 [0.08]−0.07 [0.10]−0.13 [0.18]−0.08 [0.18]
Short-run0.13 [0.08]−0.02 [0.10]−0.13 [0.18]−0.04 [0.18]
Public credit for manufacturingLong-run−0.25 [0.09] 0.15 [0.17] 
Short-run−0.09 [0.09] 0.15 [0.17] 
Public credit for infrastructureLong-run −0.04 [0.05] −0.08 [0.12]
Short-run −0.02 [0.05] −0.08 [0.12]
Best model (Aic)(2, 3, 1, 1
1, 3, 1)
(2, 3, 2
1, 0, 2)
(1, 0, 2
0, 0, 0)
(2, 1, 3
1, 2, 2, 3)
BG test (p-value)0.810.930.420.61
Bound F-test0.000.000.020.04
Ect. (p-value)−0.99*** [0.16]−0.79*** [0.15]−0.52*** [0.11]−0.61*** [0.16]

Note(s): (a) Standard errors are in brackets; (b) regressions were performed with the introduction of a time trend; (c) the intercept and trend parameters are not presented due to limited space, but are available upon request; (d) *, ** and *** mean, respectively, statically significant at 10, 5 and 1% and (e) the lag for each variable utilized in our regressions was determined based on the Akaike information criterion (AIC)

Source(s): Table by authors