Table 4

Work sections table with work section found in the outline specification of UT1 in black and No additional work sections required for UT2 to UT5

Work sectionsUT1UT2UT3UT4UT5
C30 Site clearance/excavation/filling+++++
F50 In situ concrete construction+++++
G10 Precast concrete+++++
H10 Brickwork+++++
J40 Damp-proofing+++++
K30 Metal-profiled sheet covering+++++
L10 Carpentry/timber framing/first fixing+++++
L22 Timber doors+++++
M10 Plasterboard ceilings/lining+++++
N20 Vinyl flooring+++++
Q21 Steel windows+++++
R10 Cement-based screeds+++++
R20 Plaster coatings+++++
S10 Tiling+++++
X10 Painting finishing+++++