Table 3

Delivery models mentioned during workshops

Delivery modelDescriptionLiterature baseQuotes from workshops
Construct OnlyConstruction project delivery methods help determine the way that stakeholders work together during the planning, design and building phases. While construction projects usually involve an owner, a design team and a builderWhite (2019) “Despite newer technological solutions, the offer submitted by such a manufacturer is rejected because the technical specifications of the tender do not take into account many technological aspects.”
Construct and MaintainThis delivery model is an integrated procurement model that combines the design and construction responsibilities of design-build procurements with operations and maintenanceEl-Haram, Marenjak, and Horner (2002) “This solution allows you to plan work during technical inspections, which translates into saving downtime of a given vehicle, reduces storage space because unnecessary replacement parts are not stored, and this translates into financial savings.”
“In order to reduce the costs associated with maintaining rail vehicles, an innovative solution is to equip the rolling stock with a system enabling continuous monitoring of the technical condition, including the consumption of consumables.”
Alliance ContractingUnder an alliance contract, the Owner and the Non Owner Participants. (NOPs) work together to collaboratively determine the best offer and deliver the projectSanderson, Allen, Gill, and Garnett (2018)
Gransberg and Scheepbouwer (2015) 
“This solution creates possibility to build economy of scale for the buyers and receive better offering.”

Source(s): Authors’ own elaboration

or Create an Account

Close Modal
Close Modal