Overview of the collected data
| Data collection method | Data | Participant profiles and description of the data |
|---|---|---|
| Observations | Two risk management workshops | 11 and 15 participants, representing shipping companies, charterers, surveyors, load/discharge master, terminal operators, agents and PoG, participated in the first and second workshops, respectively Focus was on risk identification and mitigation associated with the PBP |
| Eight project meetings | Three managers from PoG (one sustainability and two VTS managers), two consultants, one fleet manager of the shipping company, and one operations manager from the oil and gas company participated in the meetings Focus was on the progress of the PBP | |
| PBP introductory workshop | 30 participants representing shipping companies, shipping agencies, terminal operators, pilots, PCS developer and PoG staff were present Focus was on motivating the transition, describing how the PBP works and receive feedback about the PBP from the participants | |
| Presentation to Swedish Maritime Administration (Smart port call program) | Presentation of PBP to managers from two other Swedish ports and officials from the administration | |
| Interviews | Three follow-up interviews | Two agents and one terminal manager were interviewed Discussion was based on issues raised by the interviewees during the introductory workshop |
| Archival data | PBP project plan | Describes planned activities and milestones of the PBP |
| Two risk management reports | Describe the identified risks and mitigation measures associated with the PBP | |
| JIT emissions savings report | Estimates on potential emissions savings realized by the implementation of the PBP and JIT in Gävle | |
| PBP instruction document | Helps agents and shipping companies in berth request procedure | |
| Feedback on the PBP | Summarizes actors’ feedback and improvement suggestions obtained from the introductory workshop | |
| Description of PBP | PowerPoint document presented during the Smart port call program that provides an overview of the PBP | |
| Performance measurement indicators | List of indicators for performance measurement | |
| Port call process map | Process map over the physical structure, actors and information systems currently used in PoG | |
| Port call process quality evaluation report | Evaluation of current bottlenecks and improvement potential from various port call actors’ perspectives. The report was conducted about a year before the implementation of the PBP |
| Data collection method | Data | Participant profiles and description of the data |
|---|---|---|
| Observations | Two risk management workshops | 11 and 15 participants, representing shipping companies, charterers, surveyors, load/discharge master, terminal operators, agents and PoG, participated in the first and second workshops, respectively |
| Eight project meetings | Three managers from PoG (one sustainability and two VTS managers), two consultants, one fleet manager of the shipping company, and one operations manager from the oil and gas company participated in the meetings | |
| PBP introductory workshop | 30 participants representing shipping companies, shipping agencies, terminal operators, pilots, PCS developer and PoG staff were present | |
| Presentation to Swedish Maritime Administration (Smart port call program) | Presentation of PBP to managers from two other Swedish ports and officials from the administration | |
| Interviews | Three follow-up interviews | Two agents and one terminal manager were interviewed |
| Archival data | PBP project plan | Describes planned activities and milestones of the PBP |
| Two risk management reports | Describe the identified risks and mitigation measures associated with the PBP | |
| JIT emissions savings report | Estimates on potential emissions savings realized by the implementation of the PBP and JIT in Gävle | |
| PBP instruction document | Helps agents and shipping companies in berth request procedure | |
| Feedback on the PBP | Summarizes actors’ feedback and improvement suggestions obtained from the introductory workshop | |
| Description of PBP | PowerPoint document presented during the Smart port call program that provides an overview of the PBP | |
| Performance measurement indicators | List of indicators for performance measurement | |
| Port call process map | Process map over the physical structure, actors and information systems currently used in PoG | |
| Port call process quality evaluation report | Evaluation of current bottlenecks and improvement potential from various port call actors’ perspectives. The report was conducted about a year before the implementation of the PBP |
Source(s): Author’s illustration