Gioia methodology conceptual mapping
| First-order concepts | Second-order themes | Aggregate dimensions |
|---|---|---|
| (1) Safety and technical rules: everyone must wear personal safety devices, walking in safe areas and lanes, checking personal PSD, and other safety and technical rules | i. Plant Rules | Benchmarking factors |
| (2) Rules of conduct and behavior: the plant is characterized by a strong commitment for obeying rules of conduct, such as non-smoking in the workplace, wearing uniforms, and time regulations | ||
| (3) Relevance of WCM technical pillars: technical WCM pillars are developed, some of them (i.e. workplace organization and cost deployment) vividly emerging | ii. WCM Standards | |
| (4) Recurrence of managerial pillars: there is a recurrent and systematic emphasis on managerial WCM pillars: among them, “management commitment” and “motivation of the operators” are stressed | ||
| (5) WCM level certification: the organization is committed to reaching the highest level of the WCM certification (gold WCM plant attained in 2013) | ||
| (6) Technical tools and Toyota-like methods: the plant is characterized by the pervasive introduction and ongoing refinement of technical tools such as Andon, poka-yoke devices, assembly cards, 5 W tools | ||
| (7) Productivity and quantity goals: traditional performance indicators such as volume/quantity per period or factor productivity are still relevant and bear strong interdependencies with other classes of objectives | iii. Performance and quality goals | |
| (8) Quality goals: at all organizational levels, people emphasize the importance of attaining quality goals, specifically those attached to formal KPIs (e.g. quick kaizen) | ||
| (9) Safety goals: avoiding in-plant injuries is one fundamental requirement of WCM and this is communicated both internally and externally (signboard outside the plant) | ||
| (10) Co-design of the workplace: the design of the workplace has been shared by experts and operators, who are directly involved in the (re-)design of their workstations | iv. Workplace redesign (WPR) | Improvement factors |
| (11) Focus on ergonomics: the continuous redesign of the workplace is strongly justified by the need for enhancing the workers' psychophysical wellbeing | ||
| (12) Ongoing efforts for innovative search: there is a continuous attention to testing and introducing innovations aimed at redesigning the workplace | ||
| (13) Formal, bottom-up practices for WPR management: the bottom-up development of formal practices aims at facilitating WPR management (e.g.: line bookkeeping of errors by type/operator: can help redesign a problematic practice/better train operators) | ||
| (14) Central role of team leaders: team leaders are the focal actors; their role is particularly relevant in designing the WPR, in quality control, and in the management of team structure (through hirings) and dynamics | v. Line positions and roles | |
| (15) Supervisors and other technical roles: the compression of the hierarchical structure entails a larger span of control for supervisors: they tend to manage more workers with a widening of the responsibilities | ||
| (16) Plant manager and HR manager: they are readily available, can be reached within one hour, and can immediately mandate new regulations | ||
| (17) Small plant: a small plant is introduced for purposes of training and job redesign. The small plant is located on-site (normally located remotely, only used for studying ergonomics and the design of the working stations) | vi. Small plant design and refinement | |
| (18) The small plant as a compass: all workers learn in the small plant. It helps them make sense of their contribution to the whole process | ||
| (19) Mistake management process: the work process is designed to allow for an early detection of mistakes, through procedures, incentive systems (no punishment for errors) and tools (HERCA) | vii. Problem solving approach | |
| (20) Obsessive focus on continuous improvement: it occurs through promoting improvement, maintaining attention, no punishment, and understanding of individual issues | ||
| (21) Innovations aimed at removing elements that could hamper problem solving: initiatives are aimed at structurally reducing the scope for mistakes and improving the potential of problem solving (e.g. attention management) | ||
| (22) Daily Briefing (DB): DB was introduced as a key tool for institutionalizing the outcomes of the PDCA-based improvement process. It consists of meetings where shop floor employees propose changes to the current work practices. If successful, it can lead to plant-wide adoptions of proposals | viii. Daily Briefing (DB) | Catalyzing forces |
| (23) Emotional factors and incentives of DB: showing a non-conformity and its solution in front of the whole plant implies a relevant emotional involvement and represents a strong incentive for improvement | ||
| (24) High level of education: a very high share of line workers have attained a high level of formal education at bachelor's or master's degree (MS) levels | ix. Selection and training | |
| (25) Strong emphasis on soft skills and competences: line selection and career progression is correlated with soft skills such as listening, problem solving abilities, and empowerment, rather than technical abilities or seniority | ||
| (26) Offices directly in the plant: management offices and facilities are located close to the assembly line, such that problems and issues are addressed immediately, with minimal recourse to hierarchy | x. Layout design | |
| (27) Workstation layout aimed at ergonomics: from the onset, the design of the layout privileged ergonomics: this made it possible to preserve the well-being and attention of workers, so they could focus on improvement | ||
| (28) Suppliers have direct access to internal facilities: supply tables and other solutions allow to locate suppliers as close as possible to the assembly line, where supply issues may emerge, in order to address them quickly | ||
| (29) Listening: management of internal vertical communication has decisively changed towards a greater ability to listen actively and to take into account bottom-up signals | xi. Communication | |
| (30) Personal incentives for sharing information: horizontal communication is facilitated; workers are encouraged to share knowledge with peers, in the belief that it enables a better work environment | ||
| (31) Hierarchy simplification: an important organizational redesign has produced two changes in structure: a hierarchical level has been removed and teams have been downsized | xii. Organizational restructuring | Triggering forces |
| (32) Initial workplace redesign: the workplace has undergone a profound restructuring, by using technology-based tools for the division of labor and the redesign of job description and rotation | ||
| (33) Need for an abrupt discontinuity: the productive context was not reformable through incremental change, but needed a strong signal of discontinuity aimed at radical change | xiii. Initial workshop | |
| (34) Overall recognition of a memorable event: the initial workshop is widely recognized, at all levels, as a milestone in the process of change management and initiating a new course of action regarding the plant | ||
| (35) Change workers engagement: in the workshop, workers were encouraged to set and discuss a wide range of issues (contracts, working conditions, etc.) and, in particular, start focusing on the redesign of the workplace | ||
| (36) Leverage on positive beliefs about change: positive feelings condition the behavior of workers and are a fundamental factor for change: among these, pride and identification with the company, and lack of fear about change | xiv. Management of feelings about change | |
| (37) Manage negative beliefs about status quo and change: many negative feelings had to be managed in the initial stage, such as, for example, beliefs related to rule violation, fear of dismissal, and generic fears about change | ||
| (38) Monitor and influence neutral feelings: the initial context was characterized by neutral feelings about organizational change; many workers never thought of not making it and there was a broad scepticism about closing the plant |
| First-order concepts | Second-order themes | Aggregate dimensions |
|---|---|---|
| (1) | i. Plant Rules | Benchmarking factors |
| (2) | ||
| (3) | ii. WCM Standards | |
| (4) | ||
| (5) | ||
| (6) | ||
| (7) | iii. Performance and quality goals | |
| (8) | ||
| (9) | ||
| (10) | iv. Workplace redesign (WPR) | Improvement factors |
| (11) | ||
| (12) | ||
| (13) | ||
| (14) | v. Line positions and roles | |
| (15) | ||
| (16) | ||
| (17) | vi. Small plant design and refinement | |
| (18) | ||
| (19) | vii. Problem solving approach | |
| (20) | ||
| (21) | ||
| (22) | viii. Daily Briefing (DB) | Catalyzing forces |
| (23) | ||
| (24) | ix. Selection and training | |
| (25) | ||
| (26) | x. Layout design | |
| (27) | ||
| (28) | ||
| (29) | xi. Communication | |
| (30) | ||
| (31) | xii. Organizational restructuring | Triggering forces |
| (32) | ||
| (33) | xiii. Initial workshop | |
| (34) | ||
| (35) | ||
| (36) | xiv. Management of feelings about change | |
| (37) | ||
| (38) |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.