Table 3.

Optimal heuristic parameters and associated expected costs

ParameterUnitDS #1DS #2DS #3
Heuristic 1Heuristic 2AHeuristic 2BHeuristic 3
h0m1·050·980·960·95
h1m1·061·081·81
sthm0·710·730·37
am− 0·15− 0·28
t1weeks36*36*20
Expected cost106 SEK8·116·546·296·06
Std dev. cost106 SEK7·46·36·05·6
*

Value is not optimised but fixed.