Table 1

Order of emergency facilities in a provisional settlement of Mirandola East

2012.5–102012.11–2013.42013.5–102013.11–2014.42016.5–102016.11–2017.5Usage during the field survey 2023.3
PM typePMAR: Prefabricated housing (ex. lot no.5)Location of the construction site2012/9/14     Vacant after demolition
Subsequently maintained as vacant land
Space used for civil protection services in the event of a disaster
Land Acquisition2012/9/14     
Construction work for infrastructure2012/10/25 started 2013/10/15 completed   
Work concession for facility 2012/11/23    
Demolition    2016 started2017/3 completed
Current situation     not in use
PMAR: Prefabricated housing (ex. lot no.9d)Location of the construction site2012/9/14     Vacant after demolition
Subsequently converted to usage as a bus terminal
Land Acquisition2012/9/14     
Construction work for infrastructure2012/10/25 started 2013/10/15 completed   
Work concession for facility 2012/11/23    
Demolition    2016 started2017/3 completed
Current situation     in use
PMS: Prefabricated school (ex. lot no.26-27)Location of the construction site2012/7/31     Usage converted from school to police box
Still in use as a police box
Land Acquisition2012/7/31     
Construction work for infrastructure2012/09/05 started  2013/11/22 completed  
Work concession for facility2012/10/16     
Current situation     in use
EPT typeEST: Temporary school (ex. lot no.19)Location of the construction site2012/7/5     Still in use as a school
Land Acquisition2012/7/5     
Construction work for infrastructure2012/08/17 started2012/11/05 completed    
Work concession for facility2012/9/20     
Expansion work 2013/02/21 started 2013/04/07 completed    
Current situation     in use
PST: Temporary gymnasium (ex. lot no.19)Location of the construction site2012/7/31     Still in use as a gymnasium
Land Acquisition2012/12/5     
Construction work for infrastructure  2013/07/01 started, 2013/09/24 completed   
Work concession for facility 2013/4/19    
Current situation     in use
BCT: 
Temporary library (ex. lot no.4)
Location of the construction site2012/7/5     Still in use as a library
Land Acquisition2012/7/5     
Construction work for infrastructure  2013/10/10 started, 2014/02/28 completed   
Work concession for facility  2013/10/10   
Expansion work  2013/11/04 started, 2014/02/28 completed   
Current situation     in use

Source(s): Ordinance of the delegated commissioner no. 40(14/09/2012), no. 41(14/09/2012), no. 53(10/10/2012), no. 61(25/10/2012) and no. 69(13/11/2012)