Table 5

Coefficient estimates of features in the 20 logistic regression models

Accuracy level5% models10% models30% models50% models100% models
Horizon (weeks)2481224812248122481224812
N total211,092212,087204,116201,129211,092212,087204,116201,129211,092212,087204,116201,129211,092212,087204,116201,129211,092212,087204,116201,129
N accurate132,757111,93582,06488,401146,301125,21889,630100,236178,907163,730123,152136,917197,312188,859162,780167,681205,121201,348189,049187,665
FeaturesIntercept−0.91*1.01*1.11*−0.44*−1.61*0.63*1.08*−0.54*−2.64*−0.77*0.40*−1.09*−4.52*−2.50*−1.12*−2.11*−6.49*−4.27*−3.27*−3.76*
Car Model A−0.03−0.06*−0.10*−0.06*−0.03−0.07*−0.11*−0.06*−0.03−0.08*−0.11*−0.05*−0.09*−0.12*−0.12*−0.02−0.17*−0.18*−0.20*−0.09*
Car Model B−0.17*−0.10*−0.11*−0.07*−0.17*−0.07*−0.10*−0.06*−0.07*−0.03−0.07*−0.05*−0.06−0.04−0.09*−0.10*−0.03−0.03−0.06−0.06
Car Model C0.000.030.010.020.020.07*0.030.04*0.09*0.14*0.09*0.08*0.16*0.20*0.12*0.08*0.17*0.21*0.20*0.12*
Car Model D−0.08*0.00−0.06*0.09−0.14*−0.03−0.08*0.08*−0.15*−0.04*−0.09*0.08*−0.030.03−0.020.13*0.16*0.18*0.11*0.16*
Car Model E0.12*0.04*0.020.04*0.13*0.020.010.03*0.19*−0.04*−0.05*0.000.24*−0.13*−0.09*−0.09*0.20*−0.11*−0.03−0.13*
Car Model F−0.08*0.020.05*0.12*−0.06*0.040.040.14*0.05*0.15*0.08*0.17*0.06*0.15*0.030.13*0.11*0.20*0.000.14*
Forecasted volume0.21*0.07*0.06−0.11*0.07*−0.05*−0.02−0.12*−0.28*−0.38*−0.23*−0.52*−0.14*−0.21*0.05−0.17*−0.13*−0.29*0.25*0.12*
Order life cycle0.27*0.16*−0.14*−0.50*0.22*0.15*−0.05*−0.41*0.23*0.11*0.06*−0.32*0.13*−0.11*−0.10*−0.38*−0.04−0.30*−0.35*−0.47*
Take rate−0.20*−0.11*−0.06*−0.14*−0.19*−0.11*−0.05*−0.14*−0.07*−0.02*−0.01−0.05*−0.19*−0.13*−0.28*−0.22*−0.25*−0.18*−0.51*−0.45*
Unit load−0.41*−0.32*−0.41*−0.32*−0.21*−0.15*−0.30*−0.17*0.20*0.25*0.02*0.19*0.45*0.48*0.27*0.34*0.67*0.70*0.54*0.56*
Production deviation0.28*0.22*0.05*0.09*0.29*0.21*0.05*0.10*0.21*0.18*0.04*0.08*0.12*0.13*0.000.04*0.08*0.08*−0.04*0.04
Pick-up frequency0.14*0.14*0.25*0.13*0.13*0.13*0.27*0.12*0.15*0.13*0.28*0.15*0.12*0.09*0.23*0.16*0.12*0.10*0.22*0.13*
Transport lead time0.09*0.06*−0.010.08*0.07*0.04*−0.04*0.09*0.09*0.06*−0.09*0.07*0.10*0.07*0.03*0.07*0.11*0.08*0.09*0.06*

Note(s): Mean coefficient estimates in the 2, 4, 8 and 12 weeks regression models, *Indicates significant (p < 0.05) features in the respective model, (–) indicates a negative effect on inaccuracy

or Create an Account

Close subscription notice
Close access options