Table 3

Rating of the significance attributed to PtD practices

ConsultingContractingGovernmentOverallK-W
Prevention through designMRMRMRMRChi-sq.p-value
Design considers safe movement of workers on site4.5414.3324.5084.4811.6320.442
Design eliminates working in confined space4.4054.3324.7914.4624.5630.102
Design considers offsite prefabrication of elements4.4344.2284.7914.4537.0270.030**
Design safety risk assessment is undertaken4.4624.2284.6454.4343.9310.140
Designing of structure to avoid risk from buried services4.3774.3914.5084.4050.6160.735
Design to avoid hazards during construction4.4624.3324.36124.4051.1960.550
Design includes clear safety notes4.3774.11124.7914.3977.3290.026**
Design considers safety of the general public4.3774.2284.6454.3975.5910.061
Design considers ease of construction4.31124.2284.7914.3975.8550.054
Design eliminates working at heights4.4054.11124.6454.37102.8490.241
Design specifies less maintenance materials4.31124.3324.43114.34110.6340.728
Designing to avoid risk from overhead cables4.29144.3324.5084.34110.9640.618
Design specifies non-hazardous materials4.34104.2874.29134.31130.2080.901
Design specifies easy to handle materials4.34104.00144.29134.24141.8740.392

Note(s):**p-value sig. @95% confidence level, R = Rank, M = Mean score, SD = Standard deviation

Source(s): Author’s compilation (2024)