Table 3

Contributing factors to the reduction and increase of supply deficit in each model

Simulation modelOptimisation model
Factors reducing deficitsAssumption of total system connectivityOptimisation mode
 No reservoir control curve so can empty out reservoir to abate supply deficitsReservoir storage and annual groundwater licenses can be optimised with regard to the inflows and demand time series
  Coarse time step
Factors increasing deficitsSimulation modeConstraints on link capacity
 Daily time step – can be subject to severe shortage at a daily time scaleReservoir control curve can prevent water release

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.