Table 1

Operation sample description with NPV, loan allocation and break-even (B/E) electricity cost results across 35 agricultural firms in Arkansas in 2023

MinAvgMax
# of Meters17.138
Current variable electricity rate in ¢/kWh5.709.6113.51
Range in initial cost ($) in 000’s243882,494
Range of current annual electricity Cost ($)2,21640,511274,604
Range of system size kWDC142481,848
Monthly access fee/demand charge est55923,186
With net-metering
NPV with immediate ITC capture (Opt. Fin.) ($) in 000’s203072,249
NPV with ITC captured over 5 years (Opt. Fin.) ($) in 000’s192942,161
Opt. Fin. (% of initial cost on long-term loan) - ITC 140%54%69%
Opt. Fin. (% of initial cost on long-term loan) - ITC n38%54%66%
B/E electricity rate immediate ITC capture2.202.352.63
B/E electricity rate with ITC captured over 5 years2.482.662.89
With avoided cost rate
Current variable electricity rate in ¢/kWh4.654.654.65
NPV with immediate ITC capture (Opt. Fin.) ($) in 000’s699684
NPV with ITC captured over 5 years (Opt. Fin.) ($) in 000’s587603
Opt. Fin. (% of initial cost on long-term loan) - ITC 132%34%39%
Opt. Fin. (% of initial cost on long-term loan) - ITC n31%33%38%
B/E electricity rate immediate ITC capture2.172.322.61
B/E electricity rate with ITC captured over 5 years2.442.612.85

Source(s): Table created by authors

or Create an Account

Close Modal
Close Modal