Key improvements from Digital Twin technology collaboration between Firm C and Company ABC
| Affected elements | Pre-collaboration (traditional methods) | Post-collaboration (DT technology) | Impacts on firm C and company ABC |
|---|---|---|---|
| Testing and simulation (Process) | Physical testing, labor-intensive and error-prone | Virtual simulation of hydraulic pumps and fans |
|
| Failure prediction and prevention (Mechanism) | Reactive failure identification during or after occurrence | Proactive prediction and mitigation through simulations |
|
| Operational flexibility (Structure) | Limited to physical environments; constrained by resources | Virtual testing across diverse operational scenarios |
|
| Affected elements | Pre-collaboration (traditional methods) | Post-collaboration (DT technology) | Impacts on firm C and company ABC |
|---|---|---|---|
| Physical testing, labor-intensive and error-prone | Virtual simulation of hydraulic pumps and fans | ||
| Reactive failure identification during or after occurrence | Proactive prediction and mitigation through simulations | ||
| Limited to physical environments; constrained by resources | Virtual testing across diverse operational scenarios |
Source(s): Authors’ own work
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.