Table 1

Applications of integrated BIM–AI

s/nSub-constructs and itemsFLNTαAVEV
AIntegrated BIM–AI for smart construction110.800.652.13
1Automated design and rule checking0.71 
23D as-built reconstruction0.82
3Event log mining0.62
4Building performance analysis0.76
5Digital twin of construction site objects0.52
6Balance of construction team0.86
7Automated progress monitoring0.70
8Automated safety management0.88
9Automated quality management0.88
10Automated contract management0.92
11Automated site progress monitoring0.77
BIntegrated BIM–AI for waste management40.870.551.26
1Waste quantitative assessment0.86 
2Demolition process planning0.54
3Optimal disposal route selection0.50
4Generating sustainable waste disposal practices0.73
CIntegrated BIM–AI for facility management90.860.620.88
13D as-built documentation0.77 
23D scan-to-BIM reconstruction0.81
3Predictive property valuation0.83
4Automatic property data classification0.84
5Predictive energy management0.92
6Thermal image analysis for defects0.71
7Automatic recognition of architectural elements0.70
8Automatic historic building management0.80
9BIM–AI-driven land supply management0.80
DIntegrated BIM–AI for data management50.800.630.77
1Automatic information retrieval from BIM model0.86 
2Intuitive voice assistant for BIM data management0.84
3AI-backed BIM content recommender system0.82
4AI voice assistant interface to convert verbal requests0.86
5Centralized data management0.78
EIntegrated BIM–AI for defects and damage detection40.810.520.36
1Automatic analysis of seismic damages in buildings0.80 
2Defect digital twinning0.70
3Automatic hazard-induced damage analysis0.73
4Predictive AI models for defects detection0.71
FIntegrated BIM–AI for sustainable design and modelling40.880.630.96
1BIM–AI-enabled energy-efficient building design0.92 
2BIM–AI-based sustainable design decision-making0.93
3Predictive AI models for HVAC energy consumption0.88
4Intelligent utilization of construction materials0.77
GIntegrated BIM–AI for project management110.920.662.11
1BIM–AI-based project performance evaluation system0.71 
2BIM–AI-based function, data and process modelling0.70
3Automated project scheduling0.90
4Creative project design generation and exploration0.90
5Collaborative project design0.71
6Automated BIM model authoring and review0.77
7Automated project cost estimating0.81
8Automated path finding0.66
9Automated code compliance checking0.71
10Automated clash detection0.74
11Automated construction simulation0.86
HIntegrated BIM–AI for construction technology40.860.713.20
1Intelligent recognition algorithms for monitoring structural damage0.76 
2Predictive AI model for forecasting structural damage0.77
3AI generated structural engineering BIM model0.76
4AI generated mechanical and electrical engineering BIM model0.74

Note(s): NT = number of items; FL = factor loading; α = Cronbach Alpha; AV = average variance explained; EV = Eigen value

Source(s): Table by authors

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.