The diagram shows a horizontal timeline starting from the left, labeled “Jan 2020” and ending on the right, labeled “Jan 2022,” with “Jan 2021” marked in the middle. At the top left, above the timeline, a right-pointing arrow is labeled “Interview round 1 (IR1).” Below it, a longer right-pointing arrow stretches from Jan 2020 past Jan 2021 towards Jan 2022, labeled “Work from home mandate (W F H M).” To its right, another right-pointing arrow is labeled “Less restrictions.” At the far right, two stacked right-pointing arrows are shown, the top labeled “I R 2” and the bottom labeled “W F H M.”Timeline of data collection and work from home mandates in Sweden. Source: Authors’ own creation
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.