The image displays a diagram with three sections labelled West, Central, and East, each identifying the main works contractor for that region. Under West, the contractor is B M B with associated logos for companies including Tideway and Morgan Sindall. The Central section lists F L O as the contractor, again highlighting Tideway, along with logos for Ferrovial Construction and Lang O Rourke. The East section features C V B as the contractor and includes Tideway alongside logos for Costain, Vinci Construction, Grands Projets, and Bachy Soletanche. Below the regional sections, there is a designation for the system integrator, shown as Tideway and Amey, with an arrow indicating a connection across the width of the diagram. Each section is clearly defined, and the layout flows from left to right.Contract structure
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.