The horizontal axis is labeled “Importance”, and ranges from 4.35 to 4.85 in increments of 0.10 units. The vertical axis is labeled “Importance - Knowledge Difference”, and ranges from 0.20 to 0.60 in increments of 0.05 units. A horizontal reference line extends across the graph at the value 0.35, and a vertical reference line rises upward at the value 4.4, dividing the scatter plot into four quadrants. The scatter plot shows multiple data points distributed across the top right quadrants. The coordinates of the data points are as follows, (4.44, 0.41), (4.48, 0.42), (4.51, 0.44), (4.54, 0.44), (4.54, 0.41), (4.58, 0.37), (4.61, 0.46), (4.62, 0.47), (4.62, 0.37), (4.67, 0.45), (4.68, 0.40), (4.68, 0.37), (4.71, 0.47), (4.71, 0.42), (4.71, 0.50), (4.71, 0.52), (4.65, 0.38), (4.70, 0.37), (4.65, 0.40), (4.72, 0.52), (4.72, 0.50), (4.79, 0.55), (4.77, 0.51), (4.70, 0.48), and (4.76, 0.52). A solid line is shown drawn at the graph, arising from (4.68, 0.56) and sloping downward to end at (4.76, 0.44). Note: All numerical data values are approximated.Knowledge proficiency – quadrant 1
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.