The figure shows a rectangular box divided into two sections by a horizontal line at the center. The section at the top is labeled “POLICY LEVEL”, and the lower section is labeled “ORGANIZATIONAL LEVEL”. In the “POLICY LEVEL”, a flowchart is shown beginning with a text box labeled “The I R Framework (2013) development process”. From “The I R Framework (2013) development process”, a right-pointing arrow arises and points to a text box labeled “The official I R Framework (2013) published”. A right-pointing arrow from that box leads to a text box labeled “Subsequent refinements to the I R Framework process”. From “Subsequent refinements to the I R Framework process”, a right-pointing arrow arises and points to a final text box labeled “Updated version of the framework”. From these four text boxes in the “POLICY LEVEL”, a double-headed vertical arrow arises and extends downward and points to a text box labeled “The implementation of the I R Framework by organizations” in the “ORGANIZATIONAL LEVEL”.Levels of analysis
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.