The diagram is arranged horizontally and compares two construction projects. On the left, a large header box reads “LAAKSO HOSPITAL CONSTRUCTION PROJECT (L Y S-ALLIANCE)” followed by “180000 meter squared gross, E U R 1003 million (cost level 9 slash 2022), 2021 to 2030”. Below this header are vertical rectangular columns labeled, from left to right: “Client”, “Main contractor”, “Architectural design”, “Electrical and H V A C engineering”, and “Geotechnical, structural and rock engineering”. Beneath these columns, a horizontal box reads “Suballiances: infrastructure and H V A C contractors”. Below that, five side-by-side subproject boxes appear. The first reads “Subproject infrastructure” with bullet points “Five development phases 2021 to 2026” and “Four implementation phases 2022 to 2029”. The second reads “Subproject main building” with bullet points “Two development phases 2021 to 2023” and “Two implementation phases 2023 to 2027”. The third reads “Subproject Ohkola new building” with bullet points “Development phase 2022 to 2024” and “Implementation phase 2024 to 2026”. The fourth reads “Subproject north new building” with bullet points “Two development phases 2024 to 2027” and “Two implementation phases 2028 to 2030”. The fifth reads “Subproject renovated buildings” with bullet points “Two development phases 2024 to 2027” and “Implementation phase 2028 to 2030”. On the right side of the figure, a second header box reads “OULU UNIVERSITY HOSPITAL CONSTRUCTION PROJECT” followed by “200000 meter squared gross, E U R 900 million (cost level 6 slash 2018), 2015 to 2030”. Below it are three vertical groupings labeled “Subproject A-alliance”, “Subproject B-alliance”, and “Subproject C-alliance”. Under “Subproject A-alliance”, the text lists “Building A”, “Two development phases 2016 to 2019”, and “Implementation phase 2019 to 2023”. Under “Subproject B-alliance”, the text lists “Building B”, “Development phase 2019”, and “Implementation phase 2019 to 2023”. Under “Subproject C-alliance”, the text lists “Buildings F and C”, “Development and implementation 2021 to 2025 (F)”, and “Development and implementation 2024 to 2029 (C)”. Below the “Subproject A-alliance” and “Subproject B-alliance” boxes, a horizontal label reads “Partiers in A-, B- and F-alliances”. Beneath it are vertical boxes labeled “Client”, “Main contractor”, “H V A C Contractor”, “Building automation contractor”, “Architectural design”, “Electrical and H V A C engineering”, and “Geotechnical and structural engineering”. Below “Subproject C-alliance”, a horizontal label reads “Partiers in C-alliance”. Beneath it are vertical boxes labeled “Client”, “Main contractor”, and “Building automation contractor”.Organization structures of the case projects LYS and OYS
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.