The vertical axis is labeled “Project Success” and ranges from 1 to 5 in increments of 1unit. The horizontal axis is labeled “Acting according to Individual Responsibilities” and ranges from 1 to 5 in increments of 1 unit. The left end of the horizontal axis reads “Strongly disagree”, and the right end reads “Strongly agree”. A single straight trend line begins at (0.8, 2.6) and increases steadily to (5.3, 4.6). It extends diagonally upward from the lower left toward the upper right across the plotted points. Numerous individual data points are plotted across the chart area, scattered above and below the trend line. Note: All numerical data values are approximated.
Relationship between “acting according to individual responsibilities” and “project success” – scatterplot with trendline