Figure 11
A multi-line chart tracking coach engagement, feature usage, and trust over six months of A I deployment.The multi-series line chart titled “Youth Teams (Ages 16 to 18) – Name Anonymized for Confidentiality” is at the top. It tracks three metrics over six months since deployment: “coach engagement” (blue circles), “feature usage” (green squares), and “trust score” (purple triangles). The vertical axis is labeled “Metric Value (percent)” from 0 to 100 with an interval of 10. The horizontal axis is labeled “Months Since Deployment” from 1 to 6 with an interval of 1. The three lines start near the lower-left corner between the metric values between 15 percent and 38 percent and increase towards the top right side, ending around 90 percent at 6 months. A blue callout box near the first blue marker reads “Initial: 23 percent”, and the blue curve is marked with percentage values at the marker as 34 percent, 48 percent, and 67 percent, and the ending point also has a callout labeled “Final 94 percent”. The background is divided horizontally and diagonally into colored phases and bands: the lower half of the chart is shaded light blue and labeled “Phase 1: Analysis Mode” on the left, transitioning to the same blue but labeled “Phase 2: Active Integration” under the right half, while the upper half includes green and purple polygonal regions that expand with time. Near month 1 on the left, an angled white label with text “Initial Deployment (Analytics Mode)” sits inside a purple band that rises as the lines move upward. Around months 2 to 3, a second diagonal white label reading “First Success: backward slash High-Press Vulnerability” points toward the region where the lines’ slopes increase at the center. At approximately month 3, slightly above the midpoint of the chart, a red-circled data point on the blue line is highlighted with a rectangular annotation box containing red text that describes a “Breakthrough Discovery”. Just before month 5, the white rectangle across three curves is labeled “Full Integration”.

Integration timeline and adoption metrics – premier league academy case study

or Create an Account

Close Modal
Close Modal