The flowchart begins with a top rectangular block labeled “Planning”, from which a vertical line extends downward, connecting four vertically aligned rectangular blocks arranged in a sequence. The rectangles are labeled from top to bottom as “Perform Scheduling”, “Perform Demand Planning”, “Prearrange Sport Equipment Transportation”, and “Prearrange Logistics at Location of Action”.