The flowchart starts with a top rectangle labeled “On-Site Post processing”, connected by a vertical line to four vertically aligned rectangles arranged in a sequence. The rectangles are labeled from top to bottom as “Check Condition of Sport Equipment”, “Restore Operational Readiness”, “Prepare Collection”, and “Dismantle Temporary Storage Facility”.
On-site postprocessing process. Source: Created by authors