Figure 9.6
ashboard showing risk score 86.3 high risk, graph with red arrow, traffic light zones, and list of local and global features.
This dashboard has been used in the second part of the study. It shows the current risk for a given endpoint (see red arrow) as well as the previous risk scores over time, mapped to a kind of traffic light system. The color red for instance indicates that there is a higher risk that the endpoint might occur within the next 90 days. On the right side, relevant local (relevant for this decision) and global (relevant for the task in general) features are presented, which had an influence on the model’s estimation [17].

or Create an Account

Close Modal
Close Modal