Figure 10.
Final VSM for the production process to manufacture the SME’s most demanded pants Refer to the image caption for details.The value stream map presents flow from the supplier to client. Supplier provides 15 fabric rolls with weekly order to production control and a weekly program. Client demand is 1000 pieces weekly, with 1 shift equals 10 hours. Transport occurs once per week. Main process steps are unroll C T 10000 sec, trace C T 5600 sec, cut C T 7300 sec, separate C T 7300 sec, sewing C T 185 sec with C O 3950 sec uptime 95 per cent, stamping C T 20 sec uptime 90 per cent, packaging C T 18 sec, and shipping with 1 day delay. Inventory points show delays of 1 day and batch sizes such as 50 pieces and 100 pieces. Lead time is 4.77 days, and value time is 30420 sec. The lower section shows detailed operations with C T, C O, uptime, batch sizes, and delays across multiple stitching and assembly steps ending with flip pants.

Final VSM for the production process to manufacture the SME’s most demanded pants

Source: Authors’ own work

or Create an Account

Close Modal
Close Modal