The diagram starts with a left text box labeled “An intention for the government to enhance M C adoption [1]”, which connects through a rightward arrow to the blue region labeled “Stage 1: Policies and regulations” and is connected to the box “Set up policies planning to enforce M C adoption [2]”. This leads to a central blue section where “Set up policies design and construction to regulate M C implementation [3]” is connected upward to two boxes, “Develop construction standards and specifications [4]” and “Develop design codes and standards [5]”. These two boxes are linked to “Industrial academia consultation, guidance, and education [6]”, which further connects to “Collect feedback from the industry [7]”. A dotted red arrow labeled “Review and Revise” loops back from feedback to the design and standards boxes. From the central section, a rightward arrow leads into a green section labeled “Stage 2: Implementation support”. Here, “Issue technical guidance material and guide industry [8]” connects to “Industrial education, training and guidance [9]”. Below, “Infrastructure advancement [10]” and “Incentivize and subsidize projects [11]” are connected upward into the same flow. From this green section, arrows move right into a purple section labeled “Stage 3: M C implementation”. Inside it, “Industrial education, training and guidance [9]” and supporting flows connect to “Initiate pilot projects [12]”. A downward arrow leads from this to “MC adoption in the industry [13]”. A dotted red arrow labeled “Instant feedback” connects from adoption back toward earlier stages, showing feedback into the system. From “M C adoption in the industry [13]”, a downward arrow leads to an orange section labeled “Stage 4: Monitoring and review” and connected to the box “Monitor and review the implementation status of the industry [14]”, which then connects rightward to “Internal review and collect feedback from the industry [15]”. A dotted red feedback loop extends from “Monitor and review the implementation status of the industry [14]” to boxes [12] and [13]. Another dotted arrow extends from “Internal review and collect feedback from the industry [15]” and splits into three branches: one branch labeled “Lesson learnt” and connected to [13]; a second branch labeled “Review and enhance” and connected to [10]; and a third branch labeled “Review” and connected to a rectangular boundary containing boxes [3], [4], and [5]. A legend on the left shows color codes: blue for “Policies and regulations”, green for “Implementation support”, purple for “M C implementation”, and orange for “Monitoring and Review”, along with arrows including “Progressive processes” for the solid arrow and dashed red arrow showing “Feedback processes”.Prospective policy framework for MC adoption
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.