The diagram presents a structural model separated into two survey sections. The upper section contains management integration, technical integration, and financial performance labelled F P. The lower section contains E M C S and environmental performance labelled E P. Arrows connect E M C S to management integration through H 4 a and to E P through H 1. Management integration connects to technical integration and to F P through H 4 b. Technical integration connects to F P through H 3 b. Arrows from both management integration and technical integration link toward E P through H 3 a. A boundary marks confounding variables in the lower right. The model shows directional hypotheses with plus signs.Conceptual model
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.