FigureĀ 2
A diagram of the coevolution of routines and IT systems.The diagram illustrates the coevolution of routines and IT systems through five cycles. Each cycle shows the interaction between the ostensive and performative aspects of routines and the IT system. The social constructivist perspectives influence the adoption and adaptation of these routines. The IT system enables and constrains the routines, which in turn shape the IT system. This process of reconfiguration of roles and relationships creates and recreates the routines and IT systems.

Coevolution of the CR routine and the CMS. Source: Authors’ own work

or Create an Account

Close Modal
Close Modal