The diagram illustrates a model fit estimation process using the bootstrapping procedure. It features interconnected nodes labeled with abbreviations such as CI, IP, EE, DT, AI, BDA, BLC, FRQ, ACC, CON, TIM, and TRA. Arrows indicate the direction of relationships between these nodes, with numerical values and rho (ρ) values provided to signify the strength and significance of these relationships. The nodes are connected in a network-like structure, showing the flow and interaction between different components of the model.Path and model fit estimation using the bootstrapping procedure. Source: Authors' own work
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.