The graph plots movement in millimetres on the left axis and load in meganewtons on the right axis against time from 0 to 2000 minutes. Curves represent O cell expansion, pile top movement, pile toe movement, barge settlement, corrected barge movement, and test load. The load increases in steps to serviceability and ultimate limit states, labelled S L S load plus pile self-weight and U L S load plus pile self-weight. Early instability of the hydraulic jack system and a survey error are marked. Movement increases gradually, then sharply near peak load before load drops to zero.Raw plots of pile movements and test loads versus time for Test Pile #2A
Note: This figure presents the typical raw test data collected from Test Pile #2A, that is, various measured pile movements and test loads versus time