Figure 3
A diagram illustrating two evaluation protocols for model training and testing.Panel A shows a time-based holdout split. It consists of a series of 13 blocks labeled from 1 to 13. The first 10 blocks are colored blue and labeled as Train (W1-10), while the last 3 blocks are colored red and labeled as Test (W11-13). Panel B shows a walk-forward backtest. It consists of a grid of blocks arranged in a diagonal pattern. The blocks are labeled from 1 to 13. The blue blocks represent the training periods, and the red blocks represent the testing periods. The process starts with a training period of six weeks, followed by a testing period of one week. This process repeats, expanding the training period by one week each time and testing on the next single week.

Evaluation protocols. Panel (a) shows the time-based holdout split: the model trains on Weeks 1–10 and is tested on Weeks 11–13. Panel (b) shows the walk-forward backtest: the model is retrained at each step on an expanding window and tested on the next single week, starting from a minimum training window of six weeks

or Create an Account

Close Modal
Close Modal