(a) Open trench with both pipes crossing the concrete blocks and extensometers attached inside plastic boxes on the pipes’ crown (section 1 on the right and section 3 on the left) and (b) extensometer cables connected to the shaft
Sign In or Create an Account
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.