Phases of the laboratory preparation of the ‘soil cake’ used for installing the suction sensor: (a) tools required, (b) initial positioning of the tube, (c) placing of the MPS-6 sensor, (d) side view of sensor cables running through the cake, (e) top view, (f) cakes after curing