Figure 5
Approximate elevation diagram of the WDN denoting subsections used in the case study. The facilities have been labelled from left to right as follows: treatment stations with a T, pumping stations with a P, groundwater wells with a W, reservoirs with an R and subnetworks with a single unique letter. Internetwork connections are denoted with a dotted line. masl, metres above sea level Refer to the image caption for details.

Approximate elevation diagram of the WDN denoting subsections used in the case study. The facilities have been labelled from left to right as follows: treatment stations with a T, pumping stations with a P, groundwater wells with a W, reservoirs with an R and subnetworks with a single unique letter. Internetwork connections are denoted with a dotted line. masl, metres above sea level

or Create an Account

Close Modal
Close Modal