Figure 7
Figure 7 Refer to the image caption for details.

Excavation of Jing’an transportation hub constructed using the concurrent upward and downward method (excavation area = 16 000 m2, excavation depth = 14·5–15·2 m)

or Create an Account

Close subscription notice
Close access options