Fig. 76.
Fig. 76. Refer to the image caption for details.

(a) Photograph of piles on installation vessel deck and piling template being lifted for deployment prior to driving at Wikinger. Same template provided a reference beam during static tension testing with subsea, remotely operated system; after Barbosa et al. (2015). (b) Schematic drawing of loading frame and reaction pile arrangement for subsea, remotely operated, static load tests at Wikinger; after Barbosa et al. (2015). (c) Detailed drawing of loading frame and reaction pile arrangement for subsea, remotely operated, static load tests at Wikinger. Person shown for scale; after Barbosa et al. (2015). Dimensions in mm, unless otherwise specified 

or Create an Account

Close Modal
Close Modal