Fig. 8.
Fig. 8. Refer to the image caption for details.

Three sample trajectories for a strategy parameterised with heuristic 2A (DS #2), with h0 = 0·95 m, h1 = 1·04 m and sth = 0·77 m. The time at which the curves intersect with the level starget corresponds to ttarget. For tmax = 72 (weeks), it can be seen that only one of these trajectories satisfies ttarget < tmax and does not lead to project delay

or Create an Account

Close Modal
Close Modal