Figure 1.
Figure 1. Refer to the image caption for details.

Levee failure scenario with backward erosion piping. (a) River water infiltration and initiation of backward erosion piping. (b) Backward erosion piping widens, and the bearing capacity of the embankment foundation declines. (c) Collapse of the embankment slope and settlement of the crest

or Create an Account

Close Modal
Close Modal